Planning & leadership guidance for North Dakota public construction. No login. Uploads stay in your browser and clear when you close the tab.

Phase 1 — Project Intake

Upload your bid documents, scope, drawings, specs, or manuals. Text is extracted in your browser only — nothing is uploaded to a server, and everything clears when you close this tab.

Upload documents

Drag & drop files here, or click to browse
PDF · DOCX · XLSX · CSV  —  bid documents, scope, drawings, specs, utility plans, manuals, schedule, engineer estimate

Or paste scope text directly

Phase 2 — Project Information

A few structured details sharpen the analysis and the resources we return. Everything except Project Name is optional.

Phase 3 — Scope Analysis

Detected work activities ranked by risk, with the reasoning and a confidence level for each. Low-confidence items are flagged so you can confirm rather than assume.

Detected work types

We pre-checked what we found in your documents. Add or remove so the interview matches your project.

Activity risk ranking

Phase 4 — Interactive Risk Interview

Questions adapt to the work we detected and to your previous answers. Answer what you can — unanswered items become verification points in the report.

Phase 5 — Leadership Review Report

Executive-quality summary for project owners and leadership. Export to Word to edit, or to PDF to attach to the bid package.